The brief was to engineer a 3.7m high frame to suspend a set of four clear acrylic graphic panels from.
Ensuring accurate positioning of the panels was essential to achieve the required visual effect.
By creating a comprehensive assembly model in Solidworks, we could be confident that the components that came from three different factories would go together when they met on site.